Safer Power Limited was awarded this project by the Kingston Beach Hotel Management to help them go green and reduce their energy bills. The project had two scopes; 1.Design, installation and commissioning of a Solar Photovoltaic plant with energy storage system of 100kWp/100kW/120kWh 2.Design, install and commission a 630A Low Voltage Board with a 80kVaRAutomatic Power Factor correction bank

Project details

  • Client: Kingston Hotel
  • Location: MOMBASA
  • Year: 2024