SBC Kenya
Description
Safer Power Limited was engaged by the multinational beverage company- SBC Kenya for their factory expansion project. As a certified EPRA A1contractor, we were contracted to undertake the turnkeyproject for their power upgrade which includes; 1.5000A Automatic Transfer Switch (ATS) 2.5000A Synchronization panel for their 1650kva generators 3.5000A type tested distribution panel 4.3MVA Automatic Voltage Stabilizer 5.Power Reticulation through busways and cables 6.3MVA 11/0.4kV SCHNEIDER ELECTRIC transfer
Project details
- Client: SBCKENYA
- Location: NAIROBI
- Year: 2024
- Extra man-hours
- Using eco materials