SBC Kenya

SBC1
SBC
SBC2
SBC1
SBC
SBC2
Description

Safer Power Limited was engaged by the multinational beverage company- SBC Kenya for their factory expansion project. As a certified EPRA A1contractor, we were contracted to undertake the turnkeyproject for their power upgrade which includes; 1.5000A Automatic Transfer Switch (ATS) 2.5000A Synchronization panel for their 1650kva generators 3.5000A type tested distribution panel 4.3MVA Automatic Voltage Stabilizer 5.Power Reticulation through busways and cables 6.3MVA 11/0.4kV SCHNEIDER ELECTRIC transfer

Project details

  • Client: SBCKENYA
  • Location: NAIROBI
  • Year: 2024
external link
  • Extra man-hours
    70%
  • Using eco materials
    88%