Reliable solar PV, laboratory power systems, campus-wide solutions, and community electrification projects
Safer Power Limited did the entire power distribution for this iconic building. This includes synchronizing Gensets to Transformers, installing low voltage busways as well as installation of common areas riser ducts.
Safer Power Group has successfully designed, fabricated, and installed a 50.4 kWp Carport Solar PV Grid-Tied System and 50 kW Huawei inverter for Export Processing Zones Authority (EPZA).
Safer Power Group successfully engineered and implemented a comprehensive renewable energy solution for Ghana High Commission, spanning two distinct buildings — The Chancery and The Ambassador's Residency.
Safer Power Group has successfully completed the design, supply, installation and commissioning of a Solar PV Grid-Tied System for KAIST University Konza. To efficiently manage and convert the solar energy, Safer Power Group integrated a Huawei inverter into the system.
Safer Power Group successfully designed and installed a standalone solar energy system for Katoloni Prayer Centre that would enable them reduce their KPLC bills both during the day and night.
Safer Power Group installed a cutting-edge 520.8 kWp Solar PV Grid-Tied System with a 540 kWh Battery Energy Storage System Backup. By combining the benefits of solar power and energy storage, this system will enable Kenya Ports Authority to enhance their energy independence, reduce electricity costs and contribute to a cleaner environment.
Safer Power Group is handling Machakos County Industrial Park. The scope covers: Design, supply and installation of high-end Fire Suppression system, Cold Rooms. Sinking of a Borehole and erection of a steel water tower.
Safer Power Group was awarded this solar street lighting project by Makueni County Government in partnership with World Bank. Implemented two Galvanized High Masts 30 and 20 Meters.
Design, supply, install and commission of a carport photovoltaic system. The system has 70kWp and 30kWh battery storage from 120pcs of Jinko 585W solar panels. It is integrated with Gensets with priority on solar.
Safer Power Group has successfully completed the design, supply, installation and commissioning of a 103.4 kWp Carport Solar PV Grid-Tied System for World Vision Regional Office. To efficiently manage and convert the solar energy, Safer Power Group integrated a 100kW Huawei inverter into the system.
Safer Power Group successfully engineered and implemented 30.5 kWp Solar PV System, 30 kW AC inverter and 40 kWh battery storage.
Safer Power Group successfully designed and installed a solar energy system for Merishaw School that would enable them reduce their KPLC bills both during the day and night.
Safer Power Group successfully engineered and implemented 40.96kWp solar PV system, 40kW AC inverters and 80 kWh battery storage.