Robust industrial solar systems, power distribution, control panels, and process automation
Safer Power Group in strategic partnership with Energy projects financier Berkeley Energy implemented an innovative 800kWp photovoltaic system.
Safer Power Group was engaged in factory expansion project. As a V1, V2, C1 Solar and A1 Electrical EPRA Certified Contractor we have been contracted to undertake a turnkey project for their power upgrade which include containerized Generators and synchronization panel, ATS (Automatic Transfer Switch), tested distribution panel, Automatic Voltage Stabilizer, Power Distribution Through Busways, Power reticulation through busways & cables, Schneider Electric transfer.
Safer Power Group did the entire Power distribution for East Africa Textile Manufacturers Co. Limited in Burundi. This includes Integrating Gensets and Transformers, Installation of low voltage boards up to and including lighting and powering the entire factory.
Safer Power Group did full EPC for this Project. We upgraded the existing power from 600KVA to 1.5MVA. We also installed a new 600KVA online Delta UPS for the plant. The second phase of this project was to design and install Power factor correction and Power protection equipment. We designed and assembled 300kVar PFC, 300KVA Delta AVR, and 60KVA AVR for normal lighting.